News
242
results for
News, Aalto University Campus & Real Estate
Route to Maarintalo and Terveystalo is changing
The beginning of the S盲hk枚miehentie will be closed again and the driving route to Maarintalo will be made through the ISS depot / Otakaari 8 parking area.

Aalto University鈥檚 TUTLI project eParkly gathers the parking related data on the A Grid parking area to develop future parking solutions
eParkly pilot begins on the A Grid parking area (A Grid B Otakaari 5, area code 541) on Monday 29th of March 2021. eParkly is a platform for providing a better parking experience to car drivers by real-time sensing of parking area utilization rates.

Interruption of district heating distribution in the following properties: Betonimiehenkuja 3 and 5
District heating will be suspended in Betonimiehenkuja 3 and 5 due to maintenance work. The interruption will occur on Thursday, March 25 starting at 8am until 4pm.

Power outage impacted activities on Otaniemi campus
There was a power outage in the Otaniemi area impacting a few buildings.

Slowness in the Aalto Space application
Aalto Space application will be updated and improved between 11th and 19th March and there may be slowness in the application during this time.

Excavation on Otaniementie to start 3rd March
The excavation work will take place on Otaniementie at the northern and southern sides of Otakaari junction from Wednesday 3rd March.

New users to renovated Aalto University T枚枚l枚
The renovated former main building of the School of Business, Aalto T枚枚l枚, has come to life with the commissioning of the building. Two new users have been secured in the office spaces of the upper floors.

Otaniemi鈥檚 shopping centre will be renamed A Blanc
The renovation of the beautiful building designed by Alvar Aalto will be completed by summer.

Aalto University Works K3 site is starting up
The Aalto University Works K3 project is starting as planned during February with the renovation of the 鈥淪easide section鈥, continuing with the demolition of the old office wing and the construction of the new section.

Blasting and excavation work on Otaniemi campus
A water supply canal will be excavated at the Jokeri Light Rail site on Otaniementie from Tuesday 26 January 2021. The excavations are expected to last until Friday聽29th January.

Mets盲hovi Radio Observatory renovation is complete
The renovation of Finland's only radio observatory is an investment into national astronomical research.

Part of the Konemiehentie will be closed - traffic arrangements are changing
At the end of January, part of Konemiehentie and one lane of S盲hk枚miehentie will be closed. The ST1 site on S盲hk枚miehentie is currently being demolished.

Otaniemi campus exceptional opening hours
Please notice the opening hours of the buildings when visiting the campus. Please find below exceptional opening hours during summer 2021 and during summer holiday season.

Access control practices are changing - read the instructions on how to proceed
The changes will take effect during December 2020, and will apply to everyone on Otaniemi campus.

The renovation of the Aalto University T枚枚l枚 building restored the spirit of the 1950s
The former main building of the School of Business in Runeberginkatu was renewed into a modern learning environment.

V盲re Building is an Architecture MasterPrize winner
Aalto University new campus complex has been awarded one of the international Architecture MasterPrize 2020 winners.

More tips for using your new access token
When using your new access control token on Otaniemi campus, please take the following spesific factors into account.

Campus sustainability champions, urban miners and James Bond of the circular economy in Campus Sustainability Event
As part of the national Energy Awareness Week, Campus Sustainability Team arranged a Sustainable Campus Event on Wednesday 7 October 2020. The programme was very varied and full topical themes, such as urban miners and the James Bond of the circular economy. In addition, the Campus Sustainability Champion was now selected for the fourth time.

Delivery of packages in Otaniemi transfers to A Bloc
Posti's parcel locker will start operating in K-Market Otaniemi on Monday, 12 October, and Lehtipiste's Pakettipiste parcel locker on the second floor of A Bloc in October on week 43.

Otaniemi already has 1,800 metres of track
The construction of Jokeri Light Rail is under way in Otaniemi. A total of 1,800 metres of track has already been laid on Maarintie, Maarinrannatie and on Lahdenpohjanraitio next to Ring Road I.
